2017 Roadway Rehabilitation Project

Sign up for InTouch Email NotificationsAll construction notifications and updates will be provided through the inTouch email notification system. Make sure you are signed up for the "2017 Roadway Rehabilitation Project Updates." 







Project Overviews
Residential Areas Preliminary Report   
East Residential Overview                    East Residential Phasing Map

Project Notices

June 28, 2017  Phase Four Spot Curb Full Depth Pavement Replacement
June 28, 2017  Phase Four 1 1/2" Mill & Overlay
May 31, 2017   Phase Three Full Depth Pavement & Full Curb Replacement
May 31, 2017   Phase Three Spot Curb Full Depth Pavement Replacement
May 4, 2017    Phase Two Full Depth Pavement Replacement
                       Phase Two 1 1/2" Mill and Overlay
April 17, 2017  Phase One Full Depth Pavement Replacement
                       Phase One 1 1/2" Mill and Overlay

                     
 
West Residential Overview                   West Residential Phasing Map

Project Notices

July 17, 2017    Phase Five Full Depth Pavement Spot Curb Replacement
July 17, 2017 Phase Five Full Depth Pavement & Full Curb Replacement
June 29, 2017 Phase Six & Seven Storm Sewer Replacement
June 23, 2017 Phase Six Drain Pipe   
June 23, 2017 Phase Four Full Depth Pavement & Full Curb Replacement
June 20, 2017 Phase Five Storm Structure Replacement
June 20, 2017 Phase Four Full Depth Pavement Replacement  
May 31, 2017  Phase Three Full Depth Pavement Replacement
May 4, 2017   Phase Two Full Depth Pavement Replacement
April 17, 2017 Phase One Full Depth Pavement Replacement
                     
 

Upcoming Meetings

No meetings currently scheduled 


Past Meetings

Meeting Date  Meeting  Documents 
April 12, 2017 2017 Roadway Rehabilitation Project Neighborhood Information Meeting
Mar. 9, 2017 Open House Meeting for the Proposed 2017 Roadway Rehabilitation Project
Feb. 1, 2017 Neighborhood Informational Meeting for the Proposed 2017 Roadway Rehabilitation Project
Oct. 26, 2016  Public Improvement Hearing 
Sept. 29, 2016  Neighborhood Information Meeting No. 2 
Aug. 25, 2016 Neighborhood Information Meeting No. 1


Project Contacts
Questions regarding the project can be directed to Tony Kutzke, principal engineer, or Doug Peterson, engineering project coordinator, at (651) 714-3593.